LADWP Haynes Transformer move
The above videoed project is regarding a 465,000lb. transformer move within the Haynes Generating Station in Long Beach, CA. The transformer was moved within the plant along with a smaller 290,000lb. transformer safely and timely for Los Angeles Department Water and Power. Our capabilities cover heavy lift, storage, and hauls and have various partners within the industry helping to keep the costs down with our logistics network.
See More

Las Vegas Raiders’ Stadium
Reliable Crane Service partnered with the primary steel erector and general contractor at The Raiders’ Stadium to provide over 16+ cranes onsite doing the structural iron. Notable picks included lifting 775,000lbs. steel modules at a 125’ radius with a 1350 metric ton (LR11350) crawler with wagon and luffer. We provided over 6,000 tons of hoisting capabilities to service the project at the peak of the project demand. With over 50+ employees at the site at one time.
See MorePower Sector
We perform all overflow services to Los Angeles Department Water and Power for overflow work. We also cover SCE through various general contractors to help assist Southern CA to modernizing outdated equipment and structures. Various power plants within These two entities, as well as, NVEnergy utilize us during their critical outages because of our outstanding safety record and project expertise.
Case Study #1:
RCS was honored to be awarded an exclusive hoisting contract for all scopes of work in support of a triennial major outage for a private natural gas and steam generated power plant in Victorville, CA; a plant that provides electricity to nearly 800,000 homes in Southern California’s High Desert!! Our crews were tasked with several responsibilities, the most important of which being the support of contracted Millwrights as they disassembled, cleaned, and reassembled steam turbines for regular maintenance and balancing. Throughout the course of the project, RCS operated and maintained eleven cranes ranging from a 330 ton Liebherr LR1300SX with derrick equipment and 264.6K lbs. suspended counterweight to a 30 ton Terex RT 230 Rough Terrain Crane. This outage was extended due to unexpected maintenance required on all three of the plant’s natural-gas-fueled combustion turbines. The unexpected changes were an “all hands on-deck” scenario that RCS took head-on, providing crews around the clock 7 days a week for nearly three months (a combined total of over 5000 labor hours – whoa). Using their well-established relationships and extensive fleet, RCS supported hoisting, trucking, and the production of engineered equipment. This was done with speed and accuracy all while tracking and projecting costs that were recorded and communicated on a near daily basis. Above is one of our favorite critical lifts from the project: the LR1300SX with suspended counterweight setting a freshly balanced low pressure (LP) Toshiba turbine with blades. This 101.8K lbs. turbine (gross weight of just over 120K lbs.) was set back into its inner housing safely and securely at a max radius of 112 ft (double whoa).

Case Study #2:
RCS specializes in servicing power generating facilities in Southern CA and all across Nevada. Here is a picture that shows us doing what we do best when decommissioning the Etiwanda Generating Plant in Rancho Cucamonga. In this picture you will see one of five of our 265-300 ton class machines removing one of 8 transformer cores for a customer that repurposes and refurbishes transformer cores for new power plants throughout the US. Each core was roughly 115,000 lbs. Our mighty 275 ton, Grove GMK5275, safely removed all cores with operator load only (46K lbs. Counterweight) and 51.7 ft. of main boom. That’s a lot of power!



EDC Las Vegas
During a short fuse timeline RCS sent 13 cranes over 2 weeks to build 7 different stages for the landmark event held every year at Las Vegas Motor Speedway. The stages are then broken out within a week with aggressive timelines to turn back over the stage to the Speedway. The event accommodates over 400,000 concert goers over a three day span yearly. We are highly skilled at event builds and also do the Coachella Festival yearly with our Southern CA branch. Take a look at various photos of the two events.
See MoreWrapper building
Wrapper Building. 1250B Tower crane, 1 of 6 in the world, was recently erected in Southern CA. This crane was erected with our 550 ton crane on an elevated podium. Engineering had to be exact to allow for such a large crane over an exposed surface during the erection. RCS did this on time and with safety examined from every angle to ensure a safe and productive tower crane build.
See More